Renovation plan · bathroom 1.5 × 2.4 m

Sage & Stone Bath

A small bathroom made calm: large warm-stone porcelain replaces the busy multicolour tiles, the shower gets its own sage zellige wall behind a brass-framed glass screen, the WC hangs off a stone ledge that hides the cistern, and a wall-hung teak vanity frees the floor by the door.

Floor area
3.6 m² · 39 sq ft

Palette and materials

Warm stone60 × 120 cm porcelain, walls
Sage zelligeShower wall, 10 cm glazed tiles
Warm greyAnti-skid 60 × 60 cm floor
TeakVanity, mirror cabinet, door
Quartz whiteVanity top, ledge, niche shelf
Brushed brassShower, taps, flush plate, screen frame

Surface by surface

SurfaceNowAfter
WallsMulticolour glossy tiles floor to ceilingWarm stone 60 × 120 cm porcelain, rectified, 2 mm grout
Shower wallSame tiles, shower pipe on the wallSage zellige to the ceiling, recessed niche with a strip light
FloorMarbleMatte anti-skid porcelain, falls to a linear brass drain in the shower
CeilingBare slab, one bulbMoisture-resistant board at 2.45 m hiding the pipes, three downlights
WCFloor-mounted with exposed cisternWall-hung WC, concealed cistern behind a stone ledge, brass flush plate
BasinSmall wall basin by the doorWall-hung teak vanity, vessel basin, mirror cabinet with a light below
WindowsTwo louvre windowsKept; frosted slats, exhaust fan in the upper one
DoorAluminiumTeak laminate on a WPC frame, brass lever

Furniture and built-ins

ItemSizeFinish
Shower screen85 × 200 cm8 mm toughened glass, brushed brass top bar and stay
Rain shower and mixer26 cm headBrushed brass, thermostatic mixer
Wall-hung WC36 × 55 cmSoft-close seat, concealed cistern
Stone ledge78 × 22 × 105 cmPorcelain-clad, quartz top
Vanity75 × 46 cmWall-hung teak, one drawer, quartz top, vessel basin and brass mixer
Mirror cabinet65 × 14 × 65 cmTeak, mirror door, LED strip below
Towel rail and towel25 cmBrass rail on the door wall

Clearances: 60 cm in front of the WC and 55 cm in front of the vanity, the standard minimums. The screen leaves a 50 cm entry into the shower; the door swings in clear of the vanity.

Lighting

General · downlightsThree IP65 7 W downlights, one over the shower.
Task · mirrorWarm LED strip under the mirror cabinet lights the face from below without glare.
Accent · nicheStrip in the shower niche, on with the downlights.

Plumbing and electrical

WhereHeightWhat
Door1.2 mSwitches outside the door: downlights, mirror light, exhaust, geyser
Vanity0.55 mWaste and hot/cold under the vanity; shaver-safe socket beside the mirror at 1.1 m
Shower1.05 mThermostatic mixer; rain shower fed from the ceiling void
WC—Concealed cistern frame in the ledge, flush plate at 0.9 m
Geyser2.2 mMoves above the false ceiling, 25 L, access panel

Order of work

  1. Week 1Take out the old tiles, WC and basin. Re-route supply and waste for the wall-hung WC and vanity, fix the cistern frame. Waterproof floor and walls, flood-test for 24 hours.
  2. Week 2Lay the floor with falls to the drain, tile the walls and the zellige shower wall, form the niche and ledge.
  3. Week 3False ceiling, lights and exhaust. Hang the WC, vanity and mirror cabinet, fit the shower, screen and door.

Room sizes are estimates from your photos and video, with the slab at 10 ft (3.05 m) as given. Measure on site before ordering the screen and vanity.

Tile textures are drawn to size for this model; wood, linen and plaster textures are CC0 scans from Poly Haven.

The photos are path-traced in Blender Cycles. The plant and vase are CC0 models from Poly Haven.

In the 3D model the light is baked from the same path tracer as the photos: sun patches, soft shadows, bounce light by day and lamp pools by evening.